2 rooms with a terrace
Living room with kitchen, 1 bedroom, bathroom + toilet
24 m2 useful area. 16 m2 terrace
We offer for sale mobile houses, in different models and with different areas.
We implement all projects from the beginning to the final. Mobile houses are low -energy (A) and made of exclusively certified (CE) materials. Our biggest bonus is that we supply modular houses to customers fully furnished and turnkey !!! (not in the Holod model, etc.)
We will arrange the whole interior for you within the price, exactly according to the visualization of the project and according to the standards of our suppliers. We will be happy to give you more specifications at a personal meeting in our showroom in Bratislava.
For each of our projects, we try to comply with 100% rule “Our project from start to final“ We provide a comprehensive service to the client in the area of modular houses, from the start of the project, design design, its subsequent production to the final implementation of the interior and exterior. For our projects we use exclusively quality materials.
In all our modular constructions we use the following materials that meet all fire and waterproof standards:
Galvanized steel load -bearing system 3.3 mm steel thickness
Walls 100mm fire -fighting PIR panel that meets all the required thermal standards
Insulation of the ceiling and floor 100 mm glass wool
The roof consists of an aluminum arched roof system, with a 3 to 5 degree slope
Floor covering is made of 22 mm non -slip plywood
10 mm floating floor (alternative: PVC, vinyl, ceramic tiles)
All walls and ceiling are plasterboard
Toilet and bathroom for complete completed: tiles and tiles in 9mm thickness. Sanity, shower, bath furniture
All rooms complete furnished with furniture and accessories
Complete kitchen made of MDF laminate with worktop made of technical stone
Safety fire -fighting
Interior doors full of lacquered MDF laminate
All windows are aluminum, three -chamber from isolated glass
All Siemens, Schneider or Samsung wiring
Fast water heater from Siemens
As required by the client's requirement to install electrical infrared heaters that are mounted on the ceiling or alternative installation of electrical radiators
All cables are fire -fighting according to Slovak standards, pulled through the ceiling and walls
Complete spot lighting
Complete installed water and waste systems
Outdoor fire -fighting material: aluminum composite panel and composite panel with wood pattern
Outdoor lighting.
Masiness of installing floor heating
Masiness of installing the solar panel system
Option to install an intelligent Home System
The entire installation system and assembly
Preparation of the mounting site
Preparation of external connection (electricity, water, waste, etc.)
Interesting accommodation, transport and diet for mounting position (for large projects)
Until 6-8 weeks after payment of the backup (for smaller projects for larger projects up to 12 weeks)
The Deliver is not responsible for not complying with the date of delivery due to the delay of international carrier and force majeure (natural disasters, earthquakes, fire, flood, war, terrorist attacks, Covid restrictions, etc.) Delays caused by accidents and theft during transport and assembly.
In the case of the circumstances above, the delay time will be credited at the date of delivery of the order.
Fill out the form; Be the first to know when new news is shared.